Imagine a post-tension concrete project with no pour strips, improved job site safety, and a process that eliminates approximately 30 days of construction time. View this quick step-by-step animation of a slab-to-wall installation.
Revolutionizing Post-Tension Precast Concrete
Save a significant amount of time and materials over other construction methods with the use of Burke Lockable Dowels. Improve site access, minimize formwork requirements, and accelerate the rate of construction.
Burke Lockable Dowel Fast Facts
The Burke Lockable Dowel eliminates the need for unsafe, costly and disruptive pour strips. In most cases, project schedules may be cut by up to 30 days or more. Review some of these fast facts.
Goodbye Pour Strips: Post-Tensioned Breakthrough Now Available in the US
Burke Lockable Dowel system is transformative—allowing for quicker delivery schedules and needless disruption. No pour strips. No safety worries. No shoring or cleaning.
Page 1 of 1